St James Hospital - Leeds
Supplied materials and labour to install and commission trace heating to provide frost protection to 60m of 4" steel pipe with 50mm mineral wool insulation.
Wayoh WWTW - Bolton
60m of external metal pipework required frost protecting. Supplied and installed FBT self regulating heating tape.
Materials Recovery Facility Building - Bishops Cleeve
ESH designed, supplied materials and labour to install a trace heating system to provide frost protection to 70m of internal and external steel pipework.
Big Wood School - Nottingham
To supply and install a trace heating and thermal insulation system to frost protect 260m of external CHW pipework.
Carlisle WWTW
600m of FTB self limiting heating tape was used to provide frost protection to exposed metal and plastic pipework. Supply and install.
Bristol International Airport
For this project ESH supplied type FBT self limiting tape.
Broadway School - Birmingham
Supplied 100m of ESRS self limited tape to this school project.