Barclays Dart Data Centre - Slough
Within this cutting edge data centre, ESH were contracted to supply and install trace heating to perform the duty of providing frost protection to the high water mist pipework located within the loading bay.
Tuesday, 21 September 2010
Wednesday, 15 September 2010
Wednesday, 8 September 2010
Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system for:
To supply and install a frost protection trace heating system for:
- Approximately 20m of stainless steel sludge inlet pipework associated with two blender tanks
- Two runs of water pipe between the kiosk and the building. These are 5m x 32mm ABS and 2m x50mm ABS pipework in close proximity
Friday, 13 August 2010
Monday, 9 August 2010
Thursday, 5 August 2010
Cadbury's Trebor - Sheffield

At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html

At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html