Monday, 18 October 2010

The European Centre For Medium Range Weather Forecasts - Reading
Our second protect at the ECMWF was spilt into two parts: 

  • To supply and install a trace heating system to provide frost protection of the chilled water flow and return pipework 
  • To provide and install a leak detection system in the DRS building

Friday, 15 October 2010

Naburn WWTW - York
The protect scope was to install and commission 80m of Zone 1, Gas Group 11B, Classification T3 Hazardous Area trace heating to provide frost protection.

Tuesday, 12 October 2010

Samlesbury Aerodrome - Blackburn
Designed, supplied and installed trace heating to 75m of cooling water diesel pump pipework in order to protect against frost.

Wednesday, 6 October 2010

Merchant Square, Building D - Paddington
Our second project involved ESH carrying out the trace heating to frost protect the steel pipework within the plant room. 100m of type ESRS self regulating heating tape was supplied and installed.

Monday, 4 October 2010

Cabinet Office - London
Within this Cabinet Office address ESH designed, supplied and installed a trace heating system to provide frost protection on the chilled water pipework and the ancillary fittings. 105m of type FBT self limiting tape installed onto the steel pipework.

Wednesday, 29 September 2010

Leighswood Primary School - Aldride
385m of roof mounted LPHW pipework was frost protected using type VC constant wattage trace heating tape. Supply and installed project.

Monday, 27 September 2010

Batemans Salem Bridge Brewery - Skegness
This project for George Bateman & Son Ltd, involved ESH supplying materials and labour to install and commission trace heating and thermal insulation to provide frost protection to both the caustic and waste water pipework.