Isebrook School - Kettering
Supplied, installed and commissioned the trace heating and thermal insulation to provide frost protection to the 50mm infill and 150mm suction steel pipework.
Friday, 12 November 2010
Monday, 8 November 2010
Thursday, 4 November 2010
Rhodia UK - Oldbury
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.