Tuesday, 23 November 2010

Tesco Distribution - Milton Keynes
Supplied just over 100m of VCB constant wattage heating tape to this project.

Friday, 19 November 2010

Macclesfield WWTW
To design supply materials and labour to install the trace heating system providing frost protection to the external metal pipework.

Thursday, 18 November 2010

Ernest Jackson - Crediton 
For this manufacturer of medicated confectionery and vitamin products, ESH supplied and installed trace heating to temperature maintain 2.5" pipework containing glucose at +40°C. 175m of type VCB constant wattage tape installed.  

Wednesday, 17 November 2010

Sainsbury's Stores - Fareham & Colchester
For these two stores ESH supplied a total of 230m of type VCB constant wattage heating tape along with 5x trace heating monitoring units to be installed onto the fire sprinkler system.

Tuesday, 16 November 2010

Holchem Laboratries - Rossendale 
70m of type TF braided constant wattage trace heating tape was supplied and installed to maintain the 2" O pipework at +30°C.
BNS Nuclear Services - Leicester 
Designed and supplied 12 x one off precipitator heating jackets.

Monday, 15 November 2010

Optegra Eye Hospital - Manchester
The project scope was to supply and install a trace heating system to frost protect approximately 80m of pipework within the basement area. The pipework included the HWS flow and return and the CWS all in a bank of pipes.