Dulwich Leisure Centre - London
During the centres refurbishments, ESH supplied 440m of type FBT self limiting heating tape.
Chris Kennicott Water Technology - Wolverhampton
The project scope was to supply and install a trace heating and thermal insulation system to temperature maintain 130m of caustic soda pipework at +18°C. We also supplied the trace heating materials to maintain two tanks.
McCormick Europe - Littleborough
Supplied and installed 75m of type VC constant wattage trace heating tape to perform the duty of frost protection.
St James Hospital - Leeds
Supplied materials and labour to install and commission trace heating to provide frost protection to 60m of 4" steel pipe with 50mm mineral wool insulation.
Wayoh WWTW - Bolton
60m of external metal pipework required frost protecting. Supplied and installed FBT self regulating heating tape.
Materials Recovery Facility Building - Bishops Cleeve
ESH designed, supplied materials and labour to install a trace heating system to provide frost protection to 70m of internal and external steel pipework.
Big Wood School - Nottingham
To supply and install a trace heating and thermal insulation system to frost protect 260m of external CHW pipework.