Friday, 13 August 2010

Chandlers Wharf Apartments - Liverpool
ESH were contracted to supply and install a trace heating system to the DHWS in order to maintain the pipework temperature at +55°C.

Monday, 9 August 2010

College Keep - Southampton 
Type H2OWAT65 self regulating heating tape was supplied and installed to provide temperature maintenance to 50m of DHWS pipework.

Thursday, 5 August 2010

Cadbury's Trebor - Sheffield

At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.


http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html

Monday, 2 August 2010

Shrewsbury Fire Station
43m of domestic hot water services pipework was installed with H20WAT65 self limiting heating tape, to temperature maintain +65°C. Supply and install.

Tuesday, 27 July 2010

Rolls Royce - Derby
ESH were contracted to replace the existing trace heating installed on the lime dosing system. Supplied and installed both trace heating and thermal insulation.

Wednesday, 21 July 2010

National Grid - Isle Of Grain
ESH supplied our type SCBX ATEX Approved constant wattage heating tape.

Thursday, 15 July 2010

Scarriff WWTP
Supplied this treatment plant with type FBT self limiting trace heating tape.