Thursday 29 April 2010

Dulwich Leisure Centre - London
During the centres refurbishments, ESH supplied 440m of type FBT self limiting heating tape.

Wednesday 28 April 2010

Chris Kennicott Water Technology - Wolverhampton
The project scope was to supply and install a trace heating and thermal insulation system to temperature maintain 130m of caustic soda pipework at +18°C. We also supplied the trace heating materials to maintain two tanks.

Monday 26 April 2010

McCormick Europe - Littleborough
Supplied and installed 75m of type VC constant wattage trace heating tape to perform the duty of frost protection.

Friday 23 April 2010

St James Hospital - Leeds
Supplied materials and labour to install and commission trace heating to provide frost protection to 60m of 4" steel pipe with 50mm mineral wool insulation.

Thursday 22 April 2010

Wayoh WWTW - Bolton
60m of external metal pipework required frost protecting. Supplied and installed FBT self regulating heating tape.

Wednesday 21 April 2010

Materials Recovery Facility Building - Bishops Cleeve
ESH designed, supplied materials and labour to install a trace heating system to provide frost protection to 70m of internal and external steel pipework.

Friday 16 April 2010

Big Wood School - Nottingham
To supply and install a trace heating and thermal insulation system to frost protect 260m of external CHW pipework.

Thursday 15 April 2010

Carlisle WWTW
600m of FTB self limiting heating tape was used to provide frost protection to exposed metal and plastic pipework. Supply and install.

Wednesday 14 April 2010

Bristol International Airport
For this project ESH supplied type FBT self limiting tape.

Thursday 8 April 2010

Broadway School - Birmingham 
Supplied 100m of ESRS self limited tape to this school project.