Defence Communication Services Agency - Corsham
A temperature maintenance system was supplied and installed to keep the internal DHWS pipework temperatures above +55°C.
Thursday 25 February 2010
Tuesday 23 February 2010
Monday 22 February 2010
Thursday 18 February 2010
Stepan (UK) Ltd - Cheshire
Supplied materials and labour to install:
Supplied materials and labour to install:
- A frost protection system to the diesel pump cooling water organics pipework, the olium shower line, DMS shower line
- A temperature maintenance system of +70C to the caustic to manifold line and the esterquat pipework (Hazardous Area)
Tuesday 16 February 2010
Monday 15 February 2010
Friday 12 February 2010
Wednesday 10 February 2010
Tuesday 9 February 2010
Monday 8 February 2010
Friday 5 February 2010
Thursday 4 February 2010
Wednesday 3 February 2010