Wednesday 22 December 2010

Rhodia UK - Oldbury
Within the diesel generator area, ESH supplied and installed a frost protection trace heating system for 60m of steel pipework containing process water.

Tuesday 21 December 2010

Landrover - Birmingham 
Supplied and installed 40m of type ESRS self limited heating tape to provide frost protection.

Monday 20 December 2010

Pirelli Tyres - Burton On Trent
Supplied with our type SCB constant wattage heating tape.

Tuesday 14 December 2010

Toyota Motor Manufacturing - Deeside
For Toyota's Deeside engine plant, ESH supplied with 200m of type FBTBOJ self limited heating tape.

Friday 10 December 2010

AlphaGray Ltd - Melton Mowbray
ESH supplied and installed both the trace heating and thermal insulation to provide frost protection to the exposed sprinkler pipework.

Thursday 9 December 2010

The Former Bayer Crop Science Facility - Cambridge 
Supply and install a trace heating system to frost protect approximately 130m of plastic pipe up to 80mm NB.

Tuesday 7 December 2010

Neasden Rail Depot

This is the largest depot on the London underground, located between Neasden and Wembley Park stations. Here we supplied and installed a Trace Heating system to provide frost protection on both internal and external chilled water systems. Overall 600m of VCBOJ12/2 was needed.
Cornelius Vermuyden School - Essex
Supplied 109m of type VCB constant wattage heating tape.

Monday 6 December 2010

Naburn WWTW
Our second project at this site involved supplying and installing frost protection trace heating to 160m of 100mm Ø metal pipework.

Friday 3 December 2010

Roke Manor Research - Romsey
Supplied 18 x custom made IGS heating tapes, each 6 metres in length, rated at 1000watts, 240v.
Baylis Court School - Slough
Supplied materials and labour to install and commission trace heating to the DHWS pipework, in particular the pipe runs associated with the electric water heaters. 32m of pipe was temperature maintained at +55°C using our type H2OWAT55 self regulating heating tape.

Thursday 2 December 2010

Hilton Hotel - Warwick
Supplied factory terminated heating tapes for easy installation on site. 

Monday 29 November 2010

Synthite Ltd - Mold
Synthite Limited, North Wales manufactures and supplies formaldehyde and related products. 45m of type VCB constant wattage heating tape was supplied and installed to provide frost protection to stainless steel pipe carrying demineralised cold water.

Thursday 25 November 2010

Windmill Primary School - Telford
For this local project ESH supplied and installed materials and labour to install the trace heating system to temperature maintain the DHWS pipework at +55°C.

Tuesday 23 November 2010

Tesco Distribution - Milton Keynes
Supplied just over 100m of VCB constant wattage heating tape to this project.

Friday 19 November 2010

Macclesfield WWTW
To design supply materials and labour to install the trace heating system providing frost protection to the external metal pipework.

Thursday 18 November 2010

Ernest Jackson - Crediton 
For this manufacturer of medicated confectionery and vitamin products, ESH supplied and installed trace heating to temperature maintain 2.5" pipework containing glucose at +40°C. 175m of type VCB constant wattage tape installed.  

Wednesday 17 November 2010

Sainsbury's Stores - Fareham & Colchester
For these two stores ESH supplied a total of 230m of type VCB constant wattage heating tape along with 5x trace heating monitoring units to be installed onto the fire sprinkler system.

Tuesday 16 November 2010

Holchem Laboratries - Rossendale 
70m of type TF braided constant wattage trace heating tape was supplied and installed to maintain the 2" O pipework at +30°C.
BNS Nuclear Services - Leicester 
Designed and supplied 12 x one off precipitator heating jackets.

Monday 15 November 2010

Optegra Eye Hospital - Manchester
The project scope was to supply and install a trace heating system to frost protect approximately 80m of pipework within the basement area. The pipework included the HWS flow and return and the CWS all in a bank of pipes.

Friday 12 November 2010

Isebrook School - Kettering
Supplied, installed and commissioned the trace heating and thermal insulation to provide frost protection to the 50mm infill and 150mm suction steel pipework.  

Monday 8 November 2010

Loftsome Bridge STW - Yorkshire
To design, supply and install the trace heating system and thermal insulation, providing frost protection to 40m of metal pipework.
ASC Signal Corporation - USA
Designed and supplied 8 x 3.7m USA heater satellite dish heater sets.

Thursday 4 November 2010

Rhodia UK - Oldbury
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.

Tuesday 2 November 2010

Silverstone Pit & Paddock Redevelopment 

For this multi-million pound redevelopment, ESH supplied and installed a Trace Heating system to maintain DHWS pipework at 60 degrees C. This project needed just over 1300m of H20WAT65 self limiting tape to complete.

Monday 1 November 2010

Wall's Ice Cream - Gloucester
ESH supplied type FBTBOJ self limiting heating tape to the Wall's arm of Unilever Ice Cream.
Seafield STW - Leith
Supplied this water treatment plant with 500m of FBTBOJ self limiting tape.

Friday 29 October 2010

Victoria Gardens - Neath
Within this Glade ll registered park in the town of Neath, Wales, ESH supplied materials and labour to install trace heating to temperature maintain 24m of low level HWS pipework at +55°C.

Tuesday 26 October 2010

Mitchell Memorial Theatre - Hanley
100m of type H2OWAT65 self regulating heating tape was supplied and installed to temperature maintain the DHWS pipework, associated with the electric water heaters, at +65°C.

Thursday 21 October 2010

Foreign & Commonwealth Office - Milton Keynes
Designed and supplied 15 x heater panels 1000 watts 240v c/w earth screen.

Tuesday 19 October 2010

Woolwich Civic Office




Supplied and installed the Trace Heating to maintain a temperature of 55 degrees C on the hot water services pipework. 1770m of heating cable used within this futuristic looking building.

Monday 18 October 2010

The European Centre For Medium Range Weather Forecasts - Reading
Our second protect at the ECMWF was spilt into two parts: 

  • To supply and install a trace heating system to provide frost protection of the chilled water flow and return pipework 
  • To provide and install a leak detection system in the DRS building

Friday 15 October 2010

Naburn WWTW - York
The protect scope was to install and commission 80m of Zone 1, Gas Group 11B, Classification T3 Hazardous Area trace heating to provide frost protection.

Tuesday 12 October 2010

Samlesbury Aerodrome - Blackburn
Designed, supplied and installed trace heating to 75m of cooling water diesel pump pipework in order to protect against frost.

Wednesday 6 October 2010

Merchant Square, Building D - Paddington
Our second project involved ESH carrying out the trace heating to frost protect the steel pipework within the plant room. 100m of type ESRS self regulating heating tape was supplied and installed.

Monday 4 October 2010

Cabinet Office - London
Within this Cabinet Office address ESH designed, supplied and installed a trace heating system to provide frost protection on the chilled water pipework and the ancillary fittings. 105m of type FBT self limiting tape installed onto the steel pipework.

Wednesday 29 September 2010

Leighswood Primary School - Aldride
385m of roof mounted LPHW pipework was frost protected using type VC constant wattage trace heating tape. Supply and installed project.

Monday 27 September 2010

Batemans Salem Bridge Brewery - Skegness
This project for George Bateman & Son Ltd, involved ESH supplying materials and labour to install and commission trace heating and thermal insulation to provide frost protection to both the caustic and waste water pipework.

Tuesday 21 September 2010

Barclays Dart Data Centre - Slough
Within this cutting edge data centre, ESH were contracted to supply and install trace heating to perform the duty of providing frost protection to the high water mist pipework located within the loading bay.

Wednesday 15 September 2010

Tesco Supermarket - Inverness
The project here was to supply and install a frost protection trace heating system to serve 150m of 76mm carbon steel LTHW heating pipework and 25m of 15mm MCWS pipework, split across two systems.

Wednesday 8 September 2010

Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system for: 

  • Approximately 20m of stainless steel sludge inlet pipework associated with two blender tanks
  • Two runs of water pipe between the kiosk and the building. These are 5m x 32mm ABS and 2m x50mm ABS pipework in close proximity

Friday 13 August 2010

Chandlers Wharf Apartments - Liverpool
ESH were contracted to supply and install a trace heating system to the DHWS in order to maintain the pipework temperature at +55°C.

Monday 9 August 2010

College Keep - Southampton 
Type H2OWAT65 self regulating heating tape was supplied and installed to provide temperature maintenance to 50m of DHWS pipework.

Thursday 5 August 2010

Cadbury's Trebor - Sheffield

At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.


http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html

Monday 2 August 2010

Shrewsbury Fire Station
43m of domestic hot water services pipework was installed with H20WAT65 self limiting heating tape, to temperature maintain +65°C. Supply and install.

Tuesday 27 July 2010

Rolls Royce - Derby
ESH were contracted to replace the existing trace heating installed on the lime dosing system. Supplied and installed both trace heating and thermal insulation.

Wednesday 21 July 2010

National Grid - Isle Of Grain
ESH supplied our type SCBX ATEX Approved constant wattage heating tape.

Thursday 15 July 2010

Scarriff WWTP
Supplied this treatment plant with type FBT self limiting trace heating tape.

Tuesday 13 July 2010

Stepan (UK) Ltd - Cheshire 
To design, supply and install trace heating to the repositioned blow head pipework, 6 trace heating circuits each with its own thermostat.

Thursday 8 July 2010

Hope University - Liverpool
Supplied materials and labour to provide frost protection to the LTHW & CT pipework on the roof top area of the university. 220m of type VC constant wattage trace heating tape was required to complete the system.

Tuesday 29 June 2010

UBH International - Burscough
The project scope was the design, supply and install 4 x tanker heating system to two large containers.

Monday 28 June 2010

Bowscar WWTW - Penrith
A trace heating system was supplied and installed to provide frost protection to the plastic external pipework.

Thursday 24 June 2010

Denco Lubrication Ltd - Hereford
To supply and install a trace heating and thermal insulation system to maintain the lubrication pipework at +10°C, plus two identical skids to be treated at the same time.

Wednesday 23 June 2010

South Cheshire College - Crewe
Our third project here within this new college involved providing frost protection to the run round coils pipework. 200m of FBT self regulating heating tape was supplied and installed.

Tuesday 22 June 2010

ABB Limited - Telford
Designed and supplied a large heating jacket 150w/m at 240v, constructed with silicon impregnated material for inner and outer face with a c/w control thermostat.

Monday 21 June 2010

Rhodia UK - Oldbury
Supplied materials and labour to install and commission a trace heating system to frost protect external south staffs / process water pipework, within a hazardous area.

Friday 18 June 2010

Rascal Confectionery - Romford
ESH supplied 14 x 2m factory terminated type VC constant wattage heating tape, ready for installation on site.

Thursday 17 June 2010

Asda Store - Barnsley
For this new Asda store, ESH supplied materials and labour to install and commission trace heating and thermal insulation to provide frost protection to 50m of fire sprinkler pipework.

Tuesday 15 June 2010

Bishops Cleeve Bowling Club
To design and supply materials and labour to install trace heating to provide frost protection to a 22mm pipe carrying water.

Monday 14 June 2010

Launceston Town Hall
Supplied this refurbishment project with H2OWAT55 self limiting heating tape.

Friday 11 June 2010

Fleetwood WWTW
ESH were contract to add an additional 160m of trace heating to frost protect the plastic pipework.

Thursday 10 June 2010

Boots Store - Scarborough
For this new Boots store we supplied and installed trace heating to provide temperature maintenance at +55°C to the DHWS pipework.

Wednesday 9 June 2010

Asda Supermarket - Lancaster
50m of plastic cold water pipework was fitted with type FBT self regulating heating tape to provide frost protection. Supply and install.

Tuesday 8 June 2010

Piccadilly Gate - Manchester 
In total ESH supplied and installed 670m of FBT self limiting heating tape to frost protect the following pipework: 

  • Rain water harvesting pipework
  • Chilled water pipework
  • Hot water pipework

Monday 7 June 2010

Gea Farm Products - Wiltshire
Supplied and installed a trace heating system to maintain pipework at +25°C in a minimum ambient of +5°C. 

Friday 4 June 2010

Holburne Art Museum - Bath
This project involved ESH supplying and installing trace heating to provide frost protection to 102m of chilled water pipework and 51m of basic cold water system pipework. 

Thursday 3 June 2010

BAE Systems  - Blackburn
Here ESH supplied materials and labour to trace heat 170m of 150mm/28mm/20mm and 15mm external metal pipework.

Wednesday 2 June 2010

Stafford General Hospital
Our second project at Stafford General involved us supplying and installing 98m of frost protection trace heating to the external chilled water and heating pipework on the roof.

Friday 28 May 2010

Southampton General Hospital 
Within the hospitals Biomedical Research Unit, ESH designed, supplied and installed a trace heating system to maintain 570m of single DHWS pipework at +60°C.
Merchant Square, Building D - Paddington
The Merchant Square project covers an area almost the size of Soho creating 10,000,000 square feet of space between 6 ultra modern buildings. ESH were contracted to supply frost protection to the sprinkler system within building D. A total of 1500m of type ESRS self limiting heating tape was supplied and installed as well as the 25mm tick mineral wool thermal insulation.

Wednesday 26 May 2010

Boots Store - Nottingham
ESH were contracted to design, supply and install both trace heating and thermal insulation to provide frost protection to 3 x 250mm dia, fire mains pipework with 40mm mineral wool insulation with aluminium finish.

Wednesday 19 May 2010

Best Buy's - Aintree 
To design, supply and install trace heating to temperature maintain the DHWS at +55°C. 75m of H2OWAT55 was required to complete the system.

Tuesday 18 May 2010

M&S Store - Scotsbridge 
Provided frost protection to four runs of copper pipe - BCWS, MWS and MWS flow and return pipework. 70m of type VC constant wattage tape was supplied and installed. 

Tuesday 11 May 2010

Scottish Agricultural College - East Lothian
Supplied type VC constant wattage heating tape to this project.

Thursday 29 April 2010

Dulwich Leisure Centre - London
During the centres refurbishments, ESH supplied 440m of type FBT self limiting heating tape.

Wednesday 28 April 2010

Chris Kennicott Water Technology - Wolverhampton
The project scope was to supply and install a trace heating and thermal insulation system to temperature maintain 130m of caustic soda pipework at +18°C. We also supplied the trace heating materials to maintain two tanks.

Monday 26 April 2010

McCormick Europe - Littleborough
Supplied and installed 75m of type VC constant wattage trace heating tape to perform the duty of frost protection.

Friday 23 April 2010

St James Hospital - Leeds
Supplied materials and labour to install and commission trace heating to provide frost protection to 60m of 4" steel pipe with 50mm mineral wool insulation.

Thursday 22 April 2010

Wayoh WWTW - Bolton
60m of external metal pipework required frost protecting. Supplied and installed FBT self regulating heating tape.

Wednesday 21 April 2010

Materials Recovery Facility Building - Bishops Cleeve
ESH designed, supplied materials and labour to install a trace heating system to provide frost protection to 70m of internal and external steel pipework.

Friday 16 April 2010

Big Wood School - Nottingham
To supply and install a trace heating and thermal insulation system to frost protect 260m of external CHW pipework.

Thursday 15 April 2010

Carlisle WWTW
600m of FTB self limiting heating tape was used to provide frost protection to exposed metal and plastic pipework. Supply and install.

Wednesday 14 April 2010

Bristol International Airport
For this project ESH supplied type FBT self limiting tape.

Thursday 8 April 2010

Broadway School - Birmingham 
Supplied 100m of ESRS self limited tape to this school project.

Tuesday 30 March 2010

Yeovil District Hospital 
Scope of work was to design and supply materials and labour to install and commission trace heating to provide frost protection to a total of 231m pipework. The pipework included the external CHW and CWS pipes for the chiller replacement.

Friday 26 March 2010

Primark Store - Chester
Before this new Primark opened ESH supplied and installed the trace heating system providing frost protection to the following:

  • 4 & 2.5" O plastic chiller pipework, 90m
  • 15mm O copper mains pipework, 40m
  • 2" O steel HTG pipework, 75m

Wednesday 24 March 2010

Loreto College - Manchester
ESH were contracted to add additional trace heating to the roof CHW & HTG pipework. 160m of WinterTrace constant wattage trace heating tape was supplied and installed.

Monday 22 March 2010

Fleetwood WWTW
Supplied and installed 470m of FBT self regulating trace heating tape to provide frost protection to the external plastic pipework.

Friday 19 March 2010

European Centre For Medium Weather Forecasts - Reading
For this project ESH supplied and installed trace heating to perform the duty of frost protection to the chilled water pipework within the chiller areas.

Monday 15 March 2010

Dundee Hospital Treatment Unit
Supplied materials and labour to install the trace heating system to maintain the DHWS at a temperature of 55°C. 400m of H2OWAT55 was required within the hospitals new treatment unit.

Friday 12 March 2010

Abbey Town WWTW
Provided the trace heating system to perform the duty of frost protection to 12m of metal pipework. Supply and install.

Thursday 11 March 2010

RAF Odiham - Hampshire
100m of H2OWAT55 self limiting heating tape was supplied and installed to the DHWS pipework to maintain a temperature of +55°C.

Wednesday 10 March 2010

Harrogate South WWTW
Supplied and installed trace heating and lagging to the centrifuge feed pumps and associated pipework.

Tuesday 9 March 2010

Environmental Agency Office - Launceston
Within this office ESH supplied and installed the trace heating system providing frost protection to 100m of 2" Ø plastic pipework.

Monday 8 March 2010

Toyota Manufacturing UK - Burnaston
The project scope within this vehicle manufacturing plant was to supply and install trace heating and thermal lagging to maintain a temperature of up to +30°C above the minimum ambient temperature, on two liquid adhesive pipe systems.

Friday 5 March 2010

South Cheshire College - Crewe
For our second project at this site, ESH supplied and installed the trace heating system to maintain the DHWS pipework for the nursery hot water at a temperature of +55°C and to periodically raise the temperature temperature to +65°C. We installed 100m of H2OWAT65 to complete the system.
Samlesbury Aerodrome - Blackburn
ESH were contracted to extend the trace heating system which we installed late 2009 by an extra 25m, to frost protect the cooling water diesel pump pipework.

Thursday 4 March 2010

60 Treadneedle Street - London
For this building with its nine storeys of office accommodation totalling 19,900 square metres, ESH supplied and installed trace heating to provide frost protection to the external fuel oil pipework. A total of 120m of pipe from 15mm to 80mm in size was protected, including 25m of pipe which was stripped and retraced.

Wednesday 3 March 2010

Creech St Michaels Children Centre - Somerset
Supplied type H2OWAT55 self limiting tape to temperature maintain hot water pipework.

Tuesday 2 March 2010

Clinton Cards Head Office - Loughton 
650m of type VC constant wattage heating tape was supplied and installed to provide frost protection to the 6" steel sprinkler pipework.

Monday 1 March 2010

Torquay Community College
Supplied 200m of type ESRS self limiting heating tape to this redevelopment project.

Thursday 25 February 2010

Defence Communication Services Agency - Corsham
A temperature maintenance system was supplied and installed to keep the internal DHWS pipework temperatures above +55°C.

Tuesday 23 February 2010

Springfields Fuels Limited - Preston
To design, supply materials and labour to install a trace heating system to maintain the 100mm Ø oil pipework at a minimum temperature of +40°C. 160m of SC constant wattage heating tape required.

Monday 22 February 2010

Toyota Vehicle Manufacturing Plant - Burnaston
Here we supplied and installed a Trace Heating and lagging system to maintain a temperature of up to 30 degrees C. This was installed on two liquid adhesive pipe systems within the manufacturing plant.

Thursday 18 February 2010

Stepan (UK) Ltd - Cheshire
Supplied materials and labour to install: 

  • A frost protection system to the diesel pump cooling water organics pipework, the olium shower line, DMS shower line
  • A temperature maintenance system of +70C to the caustic to manifold line and the esterquat pipework (Hazardous Area) 
320m of pipework in total.

Tuesday 16 February 2010

Swiss Sixth Form Centre - Ipswich
ESH supplied and installed trace heating to perform the following duties: 

  • To maintain a temperature of +65C on the hot water services pipework 
  • To provide frost protection of the boosted cold water services pipework mounted externally on the roof

Monday 15 February 2010

Legoland - Manchester 
The project scope here was to supply and install the trace heating system to provide frost protection to the MCWS pipework in unheated areas. 180m of FBT self regulating heating tape was required to complete the work.

Friday 12 February 2010

Daniel Twaites Brewery - Blackburn
Supplied 140m of TFB constant wattage silicone insulated heating tape, to be used on caustic pipework.
Rhiwgoch WTW - Harlech
180m of type ESRS self regulating heating tape was supplied and installed to pipework across 10 different areas within this WTW.

Wednesday 10 February 2010

Merton College - Oxford
Frost protection trace heating was supplied and installed to the colleges roof mounted cold water pipework.
Stafford Hospital
100m of type H2OWAT55 was supplied and installed to provide frost protection to external hot water pipework.

Tuesday 9 February 2010

Nutwell Water Treatment Works
Both trace heating and thermal insulation was supplied and installed to provide frost protection to the sludge pumps & supernatant pumps and thermal insulation alone was fitted to the GAC wash water pipework and pumps.

Monday 8 February 2010

South Cheshire College - Crewe
For this large project ESH supplied materials and labour to install and commission trace heating to provide frost protection to the following pipework: 

  • Chilled water pipe - 404m in total over 5 zones
  • Low pressure hot water - 996m of pipework in total

Friday 5 February 2010

Sainsburys Supermarket - Wombourne
ESH supplied this project with 199m of type VC constant wattage cable.

Thursday 4 February 2010

Twycross Zoo - Atherstone
For this wild project ESH supplied and installed a trace heating system to frost protect the external chilled water pipework.

Wednesday 3 February 2010

MOD Corsham DCSA
As part of the Defence Communication Services Agency (DCSA) facelift, ESH supplied and installed a trace heating system to maintain the DHWS pipework at +55°C within 3 accommodation blocks as well as the plant room.

Tuesday 2 February 2010

Project Alpha - Salisbury
Trace heating was supplied and installed to provide frost protection to 170m of 22/34mm OD pipework on five runs.

Thursday 28 January 2010

Lightshaw WWTW - Warrington
35m of plastic 25mm Ø pipework required frost protecting. ESH supplied and installed FBT self limiting heating tape.

Tuesday 26 January 2010

Terram Limited - Pontypool
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C: 

  • Vent and dump pipes, 86m
  • Fill pipe, 54m

Monday 25 January 2010

Total Petrochemicals UK - Staylbridge
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 

  • Rubber dissolving fire sprinkler supply, 25m
  • Peroxide line, 30m
  • Fire sprinkler set, 25m
  • Compound fire valve sprinkler set, 12m
  • Vac pump set header pipework, 16m

Friday 22 January 2010

Veolia Water - Stoke On Trent
To supply and install a trace heating system to frost protect 35m of 60mm pipework and the testing of several existing trace heating circuits.
Wolverhampton Art Gallery
Within the two-storey building of Wolverhampton Art Gallery, established in 1884, ESH were contracted to test, supply and install a trace heating system to frost protect 80m of external cold & hot water pipework, also 130m of 50mm Ø pipework.

Wednesday 20 January 2010

Mars Petcare - Melton Mowbray 
For this UK pet food manufacturer, ESH supplied 75m of type VC constant wattage heating tape.

Tuesday 19 January 2010

Travel Lodge - Covent Garden


For this new modern hotel ESH supplied and installed a Trace Heating system to maintain the domestic hot water system at 55 degrees C, covering floors 1-9. This project required over 1300m of H2OWAT55.

Monday 18 January 2010

Asda Supermarket - Swanley
Supplied this project with our type VC constant wattage cable.

Friday 15 January 2010

Perelli Tyres Ltd - Burton On Trent
Supplied this tyre giant with our type SC constant wattage cable.

Tuesday 12 January 2010

Hoya Lens UK Ltd - Wrexham
Provided frost protection to the 25mm Ø plastic pipework, 36m in total. Type FBT self regulating trace heating tape was supplied and installed.

Monday 11 January 2010

Building 5 Harbourside - Bristol 
Following our work on building 7 late 2009, ESH were contract to supply and install trace heating to provide frost protection to a total of 48m of pipework within building 5.

Friday 8 January 2010

Biofuels International Ltd - Birmingham
13m of wax pipework required trace heating to maintain a temperature of +85°C. Supply and install.

Wednesday 6 January 2010

Total Petrochemicals UK Ltd - Staylbridge
For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 
  • 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
  • Vac pumps x 3 - 30m
  • 6" fire main - 8m
  • R320 tank heating - 165m

Tuesday 5 January 2010

M&S Store - Widnes
Supplied materials and labour to install the trace heating systems to provide frost protection to the HTG (flow & return) and to the AHU (flow & return) pipework.