Rhodia UK - Oldbury
Within the diesel generator area, ESH supplied and installed a frost protection trace heating system for 60m of steel pipework containing process water.
Wednesday 22 December 2010
Tuesday 21 December 2010
Monday 20 December 2010
Tuesday 14 December 2010
Friday 10 December 2010
Thursday 9 December 2010
Tuesday 7 December 2010
Monday 6 December 2010
Friday 3 December 2010
Thursday 2 December 2010
Monday 29 November 2010
Thursday 25 November 2010
Tuesday 23 November 2010
Friday 19 November 2010
Thursday 18 November 2010
Wednesday 17 November 2010
Tuesday 16 November 2010
Monday 15 November 2010
Friday 12 November 2010
Monday 8 November 2010
Thursday 4 November 2010
Rhodia UK - Oldbury
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.
Tuesday 2 November 2010
Monday 1 November 2010
Friday 29 October 2010
Tuesday 26 October 2010
Thursday 21 October 2010
Tuesday 19 October 2010
Monday 18 October 2010
The European Centre For Medium Range Weather Forecasts - Reading
Our second protect at the ECMWF was spilt into two parts:
Our second protect at the ECMWF was spilt into two parts:
- To supply and install a trace heating system to provide frost protection of the chilled water flow and return pipework
- To provide and install a leak detection system in the DRS building
Friday 15 October 2010
Tuesday 12 October 2010
Wednesday 6 October 2010
Monday 4 October 2010
Wednesday 29 September 2010
Monday 27 September 2010
Tuesday 21 September 2010
Wednesday 15 September 2010
Wednesday 8 September 2010
Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system for:
To supply and install a frost protection trace heating system for:
- Approximately 20m of stainless steel sludge inlet pipework associated with two blender tanks
- Two runs of water pipe between the kiosk and the building. These are 5m x 32mm ABS and 2m x50mm ABS pipework in close proximity
Friday 13 August 2010
Monday 9 August 2010
Thursday 5 August 2010
Cadbury's Trebor - Sheffield
At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
At this tasty project ESH were contracted to supply materials and labour to install the Trace Heating system to maintain the temperature of the glucose pipework at +55 degrees C. 700m of type VC tape used.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Monday 2 August 2010
Tuesday 27 July 2010
Wednesday 21 July 2010
Thursday 15 July 2010
Tuesday 13 July 2010
Thursday 8 July 2010
Tuesday 29 June 2010
Monday 28 June 2010
Thursday 24 June 2010
Wednesday 23 June 2010
Tuesday 22 June 2010
Monday 21 June 2010
Friday 18 June 2010
Thursday 17 June 2010
Tuesday 15 June 2010
Monday 14 June 2010
Friday 11 June 2010
Thursday 10 June 2010
Wednesday 9 June 2010
Tuesday 8 June 2010
Monday 7 June 2010
Friday 4 June 2010
Thursday 3 June 2010
Wednesday 2 June 2010
Friday 28 May 2010
Merchant Square, Building D - Paddington
The Merchant Square project covers an area almost the size of Soho creating 10,000,000 square feet of space between 6 ultra modern buildings. ESH were contracted to supply frost protection to the sprinkler system within building D. A total of 1500m of type ESRS self limiting heating tape was supplied and installed as well as the 25mm tick mineral wool thermal insulation.
The Merchant Square project covers an area almost the size of Soho creating 10,000,000 square feet of space between 6 ultra modern buildings. ESH were contracted to supply frost protection to the sprinkler system within building D. A total of 1500m of type ESRS self limiting heating tape was supplied and installed as well as the 25mm tick mineral wool thermal insulation.
Wednesday 26 May 2010
Wednesday 19 May 2010
Tuesday 18 May 2010
Tuesday 11 May 2010
Thursday 29 April 2010
Wednesday 28 April 2010
Monday 26 April 2010
Friday 23 April 2010
Thursday 22 April 2010
Wednesday 21 April 2010
Friday 16 April 2010
Thursday 15 April 2010
Wednesday 14 April 2010
Thursday 8 April 2010
Tuesday 30 March 2010
Friday 26 March 2010
Wednesday 24 March 2010
Monday 22 March 2010
Friday 19 March 2010
Monday 15 March 2010
Friday 12 March 2010
Thursday 11 March 2010
Wednesday 10 March 2010
Tuesday 9 March 2010
Monday 8 March 2010
Friday 5 March 2010
South Cheshire College - Crewe
For our second project at this site, ESH supplied and installed the trace heating system to maintain the DHWS pipework for the nursery hot water at a temperature of +55°C and to periodically raise the temperature temperature to +65°C. We installed 100m of H2OWAT65 to complete the system.
For our second project at this site, ESH supplied and installed the trace heating system to maintain the DHWS pipework for the nursery hot water at a temperature of +55°C and to periodically raise the temperature temperature to +65°C. We installed 100m of H2OWAT65 to complete the system.
Thursday 4 March 2010
60 Treadneedle Street - London
For this building with its nine storeys of office accommodation totalling 19,900 square metres, ESH supplied and installed trace heating to provide frost protection to the external fuel oil pipework. A total of 120m of pipe from 15mm to 80mm in size was protected, including 25m of pipe which was stripped and retraced.
For this building with its nine storeys of office accommodation totalling 19,900 square metres, ESH supplied and installed trace heating to provide frost protection to the external fuel oil pipework. A total of 120m of pipe from 15mm to 80mm in size was protected, including 25m of pipe which was stripped and retraced.
Wednesday 3 March 2010
Tuesday 2 March 2010
Monday 1 March 2010
Thursday 25 February 2010
Tuesday 23 February 2010
Monday 22 February 2010
Thursday 18 February 2010
Stepan (UK) Ltd - Cheshire
Supplied materials and labour to install:
Supplied materials and labour to install:
- A frost protection system to the diesel pump cooling water organics pipework, the olium shower line, DMS shower line
- A temperature maintenance system of +70C to the caustic to manifold line and the esterquat pipework (Hazardous Area)
Tuesday 16 February 2010
Monday 15 February 2010
Friday 12 February 2010
Wednesday 10 February 2010
Tuesday 9 February 2010
Monday 8 February 2010
Friday 5 February 2010
Thursday 4 February 2010
Wednesday 3 February 2010
Tuesday 2 February 2010
Thursday 28 January 2010
Tuesday 26 January 2010
Terram Limited - Pontypool
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C:
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C:
- Vent and dump pipes, 86m
- Fill pipe, 54m
Monday 25 January 2010
Total Petrochemicals UK - Staylbridge
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- Rubber dissolving fire sprinkler supply, 25m
- Peroxide line, 30m
- Fire sprinkler set, 25m
- Compound fire valve sprinkler set, 12m
- Vac pump set header pipework, 16m
Friday 22 January 2010
Wednesday 20 January 2010
Tuesday 19 January 2010
Monday 18 January 2010
Friday 15 January 2010
Tuesday 12 January 2010
Monday 11 January 2010
Friday 8 January 2010
Wednesday 6 January 2010
Total Petrochemicals UK Ltd - Staylbridge
For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
- Vac pumps x 3 - 30m
- 6" fire main - 8m
- R320 tank heating - 165m