Wednesday 22 December 2010

Rhodia UK - Oldbury
Within the diesel generator area, ESH supplied and installed a frost protection trace heating system for 60m of steel pipework containing process water.

Tuesday 21 December 2010

Landrover - Birmingham 
Supplied and installed 40m of type ESRS self limited heating tape to provide frost protection.

Monday 20 December 2010

Pirelli Tyres - Burton On Trent
Supplied with our type SCB constant wattage heating tape.

Tuesday 14 December 2010

Toyota Motor Manufacturing - Deeside
For Toyota's Deeside engine plant, ESH supplied with 200m of type FBTBOJ self limited heating tape.

Friday 10 December 2010

AlphaGray Ltd - Melton Mowbray
ESH supplied and installed both the trace heating and thermal insulation to provide frost protection to the exposed sprinkler pipework.

Thursday 9 December 2010

The Former Bayer Crop Science Facility - Cambridge 
Supply and install a trace heating system to frost protect approximately 130m of plastic pipe up to 80mm NB.

Tuesday 7 December 2010

Neasden Rail Depot

This is the largest depot on the London underground, located between Neasden and Wembley Park stations. Here we supplied and installed a Trace Heating system to provide frost protection on both internal and external chilled water systems. Overall 600m of VCBOJ12/2 was needed.
Cornelius Vermuyden School - Essex
Supplied 109m of type VCB constant wattage heating tape.

Monday 6 December 2010

Naburn WWTW
Our second project at this site involved supplying and installing frost protection trace heating to 160m of 100mm Ø metal pipework.

Friday 3 December 2010

Roke Manor Research - Romsey
Supplied 18 x custom made IGS heating tapes, each 6 metres in length, rated at 1000watts, 240v.
Baylis Court School - Slough
Supplied materials and labour to install and commission trace heating to the DHWS pipework, in particular the pipe runs associated with the electric water heaters. 32m of pipe was temperature maintained at +55°C using our type H2OWAT55 self regulating heating tape.

Thursday 2 December 2010

Hilton Hotel - Warwick
Supplied factory terminated heating tapes for easy installation on site.