Monday 29 November 2010

Synthite Ltd - Mold
Synthite Limited, North Wales manufactures and supplies formaldehyde and related products. 45m of type VCB constant wattage heating tape was supplied and installed to provide frost protection to stainless steel pipe carrying demineralised cold water.

Thursday 25 November 2010

Windmill Primary School - Telford
For this local project ESH supplied and installed materials and labour to install the trace heating system to temperature maintain the DHWS pipework at +55°C.

Tuesday 23 November 2010

Tesco Distribution - Milton Keynes
Supplied just over 100m of VCB constant wattage heating tape to this project.

Friday 19 November 2010

Macclesfield WWTW
To design supply materials and labour to install the trace heating system providing frost protection to the external metal pipework.

Thursday 18 November 2010

Ernest Jackson - Crediton 
For this manufacturer of medicated confectionery and vitamin products, ESH supplied and installed trace heating to temperature maintain 2.5" pipework containing glucose at +40°C. 175m of type VCB constant wattage tape installed.  

Wednesday 17 November 2010

Sainsbury's Stores - Fareham & Colchester
For these two stores ESH supplied a total of 230m of type VCB constant wattage heating tape along with 5x trace heating monitoring units to be installed onto the fire sprinkler system.

Tuesday 16 November 2010

Holchem Laboratries - Rossendale 
70m of type TF braided constant wattage trace heating tape was supplied and installed to maintain the 2" O pipework at +30°C.
BNS Nuclear Services - Leicester 
Designed and supplied 12 x one off precipitator heating jackets.

Monday 15 November 2010

Optegra Eye Hospital - Manchester
The project scope was to supply and install a trace heating system to frost protect approximately 80m of pipework within the basement area. The pipework included the HWS flow and return and the CWS all in a bank of pipes.

Friday 12 November 2010

Isebrook School - Kettering
Supplied, installed and commissioned the trace heating and thermal insulation to provide frost protection to the 50mm infill and 150mm suction steel pipework.  

Monday 8 November 2010

Loftsome Bridge STW - Yorkshire
To design, supply and install the trace heating system and thermal insulation, providing frost protection to 40m of metal pipework.
ASC Signal Corporation - USA
Designed and supplied 8 x 3.7m USA heater satellite dish heater sets.

Thursday 4 November 2010

Rhodia UK - Oldbury
For this project ESH supplied materials and labour to install and commission a trace heating system to phosphoric acid steel pipework. The pipework ran from the filter area to the external storage tank, approx 35m of 40mm dia pipe, including 12 bends, 7 flanges, 1 reducer and 1 valve.

Tuesday 2 November 2010

Silverstone Pit & Paddock Redevelopment 

For this multi-million pound redevelopment, ESH supplied and installed a Trace Heating system to maintain DHWS pipework at 60 degrees C. This project needed just over 1300m of H20WAT65 self limiting tape to complete.

Monday 1 November 2010

Wall's Ice Cream - Gloucester
ESH supplied type FBTBOJ self limiting heating tape to the Wall's arm of Unilever Ice Cream.
Seafield STW - Leith
Supplied this water treatment plant with 500m of FBTBOJ self limiting tape.