Yeovil District Hospital
Scope of work was to design and supply materials and labour to install and commission trace heating to provide frost protection to a total of 231m pipework. The pipework included the external CHW and CWS pipes for the chiller replacement.
Tuesday 30 March 2010
Friday 26 March 2010
Wednesday 24 March 2010
Monday 22 March 2010
Friday 19 March 2010
Monday 15 March 2010
Friday 12 March 2010
Thursday 11 March 2010
Wednesday 10 March 2010
Tuesday 9 March 2010
Monday 8 March 2010
Friday 5 March 2010
South Cheshire College - Crewe
For our second project at this site, ESH supplied and installed the trace heating system to maintain the DHWS pipework for the nursery hot water at a temperature of +55°C and to periodically raise the temperature temperature to +65°C. We installed 100m of H2OWAT65 to complete the system.
For our second project at this site, ESH supplied and installed the trace heating system to maintain the DHWS pipework for the nursery hot water at a temperature of +55°C and to periodically raise the temperature temperature to +65°C. We installed 100m of H2OWAT65 to complete the system.
Thursday 4 March 2010
60 Treadneedle Street - London
For this building with its nine storeys of office accommodation totalling 19,900 square metres, ESH supplied and installed trace heating to provide frost protection to the external fuel oil pipework. A total of 120m of pipe from 15mm to 80mm in size was protected, including 25m of pipe which was stripped and retraced.
For this building with its nine storeys of office accommodation totalling 19,900 square metres, ESH supplied and installed trace heating to provide frost protection to the external fuel oil pipework. A total of 120m of pipe from 15mm to 80mm in size was protected, including 25m of pipe which was stripped and retraced.
Wednesday 3 March 2010
Tuesday 2 March 2010