Tuesday 27 July 2010

Rolls Royce - Derby
ESH were contracted to replace the existing trace heating installed on the lime dosing system. Supplied and installed both trace heating and thermal insulation.

Wednesday 21 July 2010

National Grid - Isle Of Grain
ESH supplied our type SCBX ATEX Approved constant wattage heating tape.

Thursday 15 July 2010

Scarriff WWTP
Supplied this treatment plant with type FBT self limiting trace heating tape.

Tuesday 13 July 2010

Stepan (UK) Ltd - Cheshire 
To design, supply and install trace heating to the repositioned blow head pipework, 6 trace heating circuits each with its own thermostat.

Thursday 8 July 2010

Hope University - Liverpool
Supplied materials and labour to provide frost protection to the LTHW & CT pipework on the roof top area of the university. 220m of type VC constant wattage trace heating tape was required to complete the system.