Wednesday 29 September 2010

Leighswood Primary School - Aldride
385m of roof mounted LPHW pipework was frost protected using type VC constant wattage trace heating tape. Supply and installed project.

Monday 27 September 2010

Batemans Salem Bridge Brewery - Skegness
This project for George Bateman & Son Ltd, involved ESH supplying materials and labour to install and commission trace heating and thermal insulation to provide frost protection to both the caustic and waste water pipework.

Tuesday 21 September 2010

Barclays Dart Data Centre - Slough
Within this cutting edge data centre, ESH were contracted to supply and install trace heating to perform the duty of providing frost protection to the high water mist pipework located within the loading bay.

Wednesday 15 September 2010

Tesco Supermarket - Inverness
The project here was to supply and install a frost protection trace heating system to serve 150m of 76mm carbon steel LTHW heating pipework and 25m of 15mm MCWS pipework, split across two systems.

Wednesday 8 September 2010

Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system for: 

  • Approximately 20m of stainless steel sludge inlet pipework associated with two blender tanks
  • Two runs of water pipe between the kiosk and the building. These are 5m x 32mm ABS and 2m x50mm ABS pipework in close proximity