Leighswood Primary School - Aldride
385m of roof mounted LPHW pipework was frost protected using type VC constant wattage trace heating tape. Supply and installed project.
Wednesday 29 September 2010
Monday 27 September 2010
Tuesday 21 September 2010
Wednesday 15 September 2010
Wednesday 8 September 2010
Seedy Mill WTW - Lichfield
To supply and install a frost protection trace heating system for:
To supply and install a frost protection trace heating system for:
- Approximately 20m of stainless steel sludge inlet pipework associated with two blender tanks
- Two runs of water pipe between the kiosk and the building. These are 5m x 32mm ABS and 2m x50mm ABS pipework in close proximity