Lightshaw WWTW - Warrington
35m of plastic 25mm Ø pipework required frost protecting. ESH supplied and installed FBT self limiting heating tape.
Thursday 28 January 2010
Tuesday 26 January 2010
Terram Limited - Pontypool
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C:
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C:
- Vent and dump pipes, 86m
- Fill pipe, 54m
Monday 25 January 2010
Total Petrochemicals UK - Staylbridge
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- Rubber dissolving fire sprinkler supply, 25m
- Peroxide line, 30m
- Fire sprinkler set, 25m
- Compound fire valve sprinkler set, 12m
- Vac pump set header pipework, 16m
Friday 22 January 2010
Wednesday 20 January 2010
Tuesday 19 January 2010
Monday 18 January 2010
Friday 15 January 2010
Tuesday 12 January 2010
Monday 11 January 2010
Friday 8 January 2010
Wednesday 6 January 2010
Total Petrochemicals UK Ltd - Staylbridge
For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
- Vac pumps x 3 - 30m
- 6" fire main - 8m
- R320 tank heating - 165m
Subscribe to:
Posts (Atom)