Thursday 28 January 2010

Lightshaw WWTW - Warrington
35m of plastic 25mm Ø pipework required frost protecting. ESH supplied and installed FBT self limiting heating tape.

Tuesday 26 January 2010

Terram Limited - Pontypool
A market leader in the design and manufacturer of innovative geosynthetics including geocomposites, geotextiles and geocells. Here ESH designed, supplied and installed both trace heating and thermal insulation to maintain the following pipework at +20°C: 

  • Vent and dump pipes, 86m
  • Fill pipe, 54m

Monday 25 January 2010

Total Petrochemicals UK - Staylbridge
The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 

  • Rubber dissolving fire sprinkler supply, 25m
  • Peroxide line, 30m
  • Fire sprinkler set, 25m
  • Compound fire valve sprinkler set, 12m
  • Vac pump set header pipework, 16m

Friday 22 January 2010

Veolia Water - Stoke On Trent
To supply and install a trace heating system to frost protect 35m of 60mm pipework and the testing of several existing trace heating circuits.
Wolverhampton Art Gallery
Within the two-storey building of Wolverhampton Art Gallery, established in 1884, ESH were contracted to test, supply and install a trace heating system to frost protect 80m of external cold & hot water pipework, also 130m of 50mm Ø pipework.

Wednesday 20 January 2010

Mars Petcare - Melton Mowbray 
For this UK pet food manufacturer, ESH supplied 75m of type VC constant wattage heating tape.

Tuesday 19 January 2010

Travel Lodge - Covent Garden


For this new modern hotel ESH supplied and installed a Trace Heating system to maintain the domestic hot water system at 55 degrees C, covering floors 1-9. This project required over 1300m of H2OWAT55.

Monday 18 January 2010

Asda Supermarket - Swanley
Supplied this project with our type VC constant wattage cable.

Friday 15 January 2010

Perelli Tyres Ltd - Burton On Trent
Supplied this tyre giant with our type SC constant wattage cable.

Tuesday 12 January 2010

Hoya Lens UK Ltd - Wrexham
Provided frost protection to the 25mm Ø plastic pipework, 36m in total. Type FBT self regulating trace heating tape was supplied and installed.

Monday 11 January 2010

Building 5 Harbourside - Bristol 
Following our work on building 7 late 2009, ESH were contract to supply and install trace heating to provide frost protection to a total of 48m of pipework within building 5.

Friday 8 January 2010

Biofuels International Ltd - Birmingham
13m of wax pipework required trace heating to maintain a temperature of +85°C. Supply and install.

Wednesday 6 January 2010

Total Petrochemicals UK Ltd - Staylbridge
For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 
  • 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
  • Vac pumps x 3 - 30m
  • 6" fire main - 8m
  • R320 tank heating - 165m

Tuesday 5 January 2010

M&S Store - Widnes
Supplied materials and labour to install the trace heating systems to provide frost protection to the HTG (flow & return) and to the AHU (flow & return) pipework.