Tuesday 29 June 2010

UBH International - Burscough
The project scope was the design, supply and install 4 x tanker heating system to two large containers.

Monday 28 June 2010

Bowscar WWTW - Penrith
A trace heating system was supplied and installed to provide frost protection to the plastic external pipework.

Thursday 24 June 2010

Denco Lubrication Ltd - Hereford
To supply and install a trace heating and thermal insulation system to maintain the lubrication pipework at +10°C, plus two identical skids to be treated at the same time.

Wednesday 23 June 2010

South Cheshire College - Crewe
Our third project here within this new college involved providing frost protection to the run round coils pipework. 200m of FBT self regulating heating tape was supplied and installed.

Tuesday 22 June 2010

ABB Limited - Telford
Designed and supplied a large heating jacket 150w/m at 240v, constructed with silicon impregnated material for inner and outer face with a c/w control thermostat.

Monday 21 June 2010

Rhodia UK - Oldbury
Supplied materials and labour to install and commission a trace heating system to frost protect external south staffs / process water pipework, within a hazardous area.

Friday 18 June 2010

Rascal Confectionery - Romford
ESH supplied 14 x 2m factory terminated type VC constant wattage heating tape, ready for installation on site.

Thursday 17 June 2010

Asda Store - Barnsley
For this new Asda store, ESH supplied materials and labour to install and commission trace heating and thermal insulation to provide frost protection to 50m of fire sprinkler pipework.

Tuesday 15 June 2010

Bishops Cleeve Bowling Club
To design and supply materials and labour to install trace heating to provide frost protection to a 22mm pipe carrying water.

Monday 14 June 2010

Launceston Town Hall
Supplied this refurbishment project with H2OWAT55 self limiting heating tape.

Friday 11 June 2010

Fleetwood WWTW
ESH were contract to add an additional 160m of trace heating to frost protect the plastic pipework.

Thursday 10 June 2010

Boots Store - Scarborough
For this new Boots store we supplied and installed trace heating to provide temperature maintenance at +55°C to the DHWS pipework.

Wednesday 9 June 2010

Asda Supermarket - Lancaster
50m of plastic cold water pipework was fitted with type FBT self regulating heating tape to provide frost protection. Supply and install.

Tuesday 8 June 2010

Piccadilly Gate - Manchester 
In total ESH supplied and installed 670m of FBT self limiting heating tape to frost protect the following pipework: 

  • Rain water harvesting pipework
  • Chilled water pipework
  • Hot water pipework

Monday 7 June 2010

Gea Farm Products - Wiltshire
Supplied and installed a trace heating system to maintain pipework at +25°C in a minimum ambient of +5°C. 

Friday 4 June 2010

Holburne Art Museum - Bath
This project involved ESH supplying and installing trace heating to provide frost protection to 102m of chilled water pipework and 51m of basic cold water system pipework. 

Thursday 3 June 2010

BAE Systems  - Blackburn
Here ESH supplied materials and labour to trace heat 170m of 150mm/28mm/20mm and 15mm external metal pipework.

Wednesday 2 June 2010

Stafford General Hospital
Our second project at Stafford General involved us supplying and installing 98m of frost protection trace heating to the external chilled water and heating pipework on the roof.