Defence Communication Services Agency - Corsham
A temperature maintenance system was supplied and installed to keep the internal DHWS pipework temperatures above +55°C.
Thursday, 25 February 2010
Tuesday, 23 February 2010
Monday, 22 February 2010
Thursday, 18 February 2010
Stepan (UK) Ltd - Cheshire
Supplied materials and labour to install:
Supplied materials and labour to install:
- A frost protection system to the diesel pump cooling water organics pipework, the olium shower line, DMS shower line
- A temperature maintenance system of +70C to the caustic to manifold line and the esterquat pipework (Hazardous Area)
Tuesday, 16 February 2010
Monday, 15 February 2010
Friday, 12 February 2010
Wednesday, 10 February 2010
Tuesday, 9 February 2010
Monday, 8 February 2010
Friday, 5 February 2010
Thursday, 4 February 2010
Wednesday, 3 February 2010
Subscribe to:
Posts (Atom)