Thursday 18 February 2010

Stepan (UK) Ltd - Cheshire
Supplied materials and labour to install: 

  • A frost protection system to the diesel pump cooling water organics pipework, the olium shower line, DMS shower line
  • A temperature maintenance system of +70C to the caustic to manifold line and the esterquat pipework (Hazardous Area) 
320m of pipework in total.

No comments:

Post a Comment