Monday 15 March 2010

Dundee Hospital Treatment Unit
Supplied materials and labour to install the trace heating system to maintain the DHWS at a temperature of 55°C. 400m of H2OWAT55 was required within the hospitals new treatment unit.

No comments:

Post a Comment