The project scope was to supply materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- Rubber dissolving fire sprinkler supply, 25m
- Peroxide line, 30m
- Fire sprinkler set, 25m
- Compound fire valve sprinkler set, 12m
- Vac pump set header pipework, 16m
No comments:
Post a Comment