For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework:
- 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
- Vac pumps x 3 - 30m
- 6" fire main - 8m
- R320 tank heating - 165m
No comments:
Post a Comment