Wednesday 6 January 2010

Total Petrochemicals UK Ltd - Staylbridge
For this project ESH designed, supplied materials and labour to install and commission the trace heating system to provide frost protection to the following pipework: 
  • 6" mineral oil line from the tank to bund, mineral oil line to R320 tank and mineral oil line to dissolvers - 313m of pipework
  • Vac pumps x 3 - 30m
  • 6" fire main - 8m
  • R320 tank heating - 165m

No comments:

Post a Comment